Portfolio San Diego/California The Pyramid
|
 |
|
 |
| |
 |
|
SAN DIEGO DESIGN CENTER MIRAMAR METROPLEX - OFFICE (BUILDING A), San Diego, California [ Photos | Leasing ]
PROPERTY DESCRIPTION
| Property Name |
: |
Miramar Metroplex - Office (Building A) |
| Address |
: |
7310 Miramar Road San Diego, California |
| Building Type |
: |
Class A Office Building; Built 1992; full renovation completed in 2010. |
| Building Size |
: |
131,218 rentable square feet |
| Height |
: |
6 Stories |
| Parking |
: |
Underground parking with elevator access; additional surface outdoor parking; with approximately 4 per 1,000 parking ratio. |
| HVAC System |
: |
Variable air volume HVAC system, Variable Frequency Drive and digitally controlled for separate heating and cooling zones. |
| Fire Protection |
: |
100% fully sprinklered. |
| Structure/Grade with Foundation |
: |
Steel with column support. 5" reinforced concrete slab on concrete footings. |
| Walls |
: |
Exterior high performance putter green reflective glass over steel frame; interior of reflective glass; demising walls are drywall. |
| Floors |
: |
Reinforced concrete slab on ground. 2nd through 6th floors are 3" lightweight concrete over 2", 18 gauge galvanized metal deck. |
| Site Description |
: |
Unique "landmark" space frame/reflective glass architecture. Grand entry from adjacent street level parking. Interior landscaped courtyard with hanging white dove sculpture. |
| Elevators |
: |
Three glass walled observation elevators. Separate oversized service elevator. Elevator walls are 2-hour rated. |
| Miscellaneous |
: |
Truck service loading area. |
AMENITIES
The Building’s unique architecture makes it a recognizable San Diego landmark providing instant recognition. In addition to its design recognition, the Building sits on a high traffic corner, which provides maximum visibility. The property is centrally located on Miramar Road, in close proximity to I-15 and I-805 freeway access. There are many dining and retail establishments within walking distance of the Building.
The Building has recently undergone significant renovations, just completed in 2010, with a capital expenditure of approximately $2.5 million, to include:
- New paint on exterior space frame of building.
- Entirely new lobby design, including new slab of exposed aggregate, new landscaping in lobby, interior painting, installation of seating area, with new furniture, built in bar and bench seating, free T-1 speed Wi-Fi access, hanging sculpture designed and fabricated by artist Matt Devine to complement the open lobby area.
- Extensive renovations to common areas, including total renovations for all restrooms; new tile for elevator lobbies of all floors and perimeter walkways.
- Renovation of entire HVAC system to maximize energy efficiency, including:
- Replace Building Automation System -- Install Honeywell’s Commercial Building System programmed to sequence chillers, control operation of chilled water pumps, heating hot water boiler, and operation of heating hot water pumps.
- Chilled Water Pump Variable Frequency Drive Installed on Chilled Water Pumps with an estimated 33% energy savings.
- Heating Hot Water Pump Variable Frequency Drive installed for additional energy savings;
- Garage Exhaust Motor Variable Frequency Drive installed to underground parking exhaust fan for additional savings.
- Alarm monitored CO detection sensors throughout the underground parking structure.
- Electrical retrofit to energy efficient lighting.
- New roof installed in 2008, upgraded in 2010.
- New Key Fob security system for entrances, and elevators.
- Secure, Card Reader Access Control gated underground parking.
Approved for office condominium use.
|
|
|
 |
|
 |
|